網頁

星期一, 6月 01, 2015

MassDOT to Motorists: Plan Ahead for I-93 Restrictions through Boston Complete Overnight Closure of the Tip O’Neill Tunnel/I-93 Southbound Tuesday, June 2nd

MassDOT to Motorists: Plan Ahead for I-93 Restrictions through Boston
Complete Overnight Closure of the Tip O’Neill Tunnel/I-93 Southbound Tuesday, June 2nd  

BOSTON—Starting tomorrow, Tuesday, June 2nd at 11 PM, overnight into Wednesday, June 3rd, the Massachusetts Department of Transportation’s maintenance schedule will require complete lane closures of the Tip O’Neill Tunnel/I-93 in the southbound direction through Boston.

Beginning at Exit 28 on I-93 southbound, traffic will be diverted to the Mystic Ave Offramp at Exit 28, to begin along the detour route.  Upon exiting the offramp, all traffic will be directed through Sullivan Square to Rutherford Ave, following to the Surface Artery southbound.  At that point, traffic will return to the onramp from Albany Street at Herald Street returning to I-93 southbound.
            
The full closure will begin at 11 PM on Tuesday, June 2nd, and last until 5 AM Wednesday, June 3rd.  In the event of inclement weather, the closure will be postponed.

MassDOT encourages drivers to avoid the area and seek alternate routes to minimize delays.  Those traveling through the area should expect delays and should reduce speed and use caution while traveling along the detour routes. 

Work to be performed includes roadway sweeping, wall and sign washing.

For transportation news and updates visit MassDOT at our website: www.mass.gov/massdot, blog:www.mass.gov/blog/transportation, or follow MassDOT on twitter at www.twitter.com/massdo

沒有留言: